Thursday, October 31, 2013

More Work Inside the Cab

The new bracket for the steering is complete. Will also be running the brake pedal off the same bracket.



The bracket is welded between the two cross brace for a super strong hold.




Started to make a template for some interior parts for the cab. Will use the template for a fiberglass mold that will be covered with material that will match the seats.



Chris started on the brake pedal mounting. The pivot rod of the brake goes though the steering bracket and is welded 380 degrees and has its own bracket that is welded to the cross brace.



The master cylinder is mounted on the frame rail. The first mount is made and will be making one more. The mount still needs to be finished and beautified. Chris had a chance to finished up the brake setup today. I had taken the day off but will take pictures tomorrow of the finished setup and post them.



A better picture of the brake bracket. Needed to notch out the brace to make room for pedal travel.



The brake pedal all back together and notch is all fill in.



Both bracket finished and push rod installed.



Push rod is adjustable for different pedal heights.



Better look at the two brackets that hold the master cylinder.




Thank You Sam and Coolhand for your suggestions on making our brake setup more safe with the double shear. That is what I love about the H.A.M.B. you can get advice and knowledge from a bunch of great guy's and gal's. This is the setup we came up with.



Looking down from the driver seat.



Also did the lower bolt to. Still need to work on the length of the bolt.

No comments:

Post a Comment