Sunday, April 12, 2015

Box Frame Begins

 The main frame supports and body mounts have been completed and now we will start to work on the bottom framing that will contain the boxes that will hold tanks and equipment that is needed. Next we plan on trying to get most of the wiring and pluming done in the boxes before we install the flooring and upper structure.


 The pizza ovens will sit on this structure and the sides will have removable panels for engine maintenance that can be accessed from inside the box.

 We will have two levels inside one for the equipment to sit on and the the lower one will be the walkway.
This was designed to keep us as close to the outside customer as possible.
  


 These will be some of the parts that will complete the lower box framing.

 Tubing that we had bent for the radius corners.


Some of the radius parts that has been installed

No comments:

Post a Comment